Breaking News

Arroyo Administration to Bid for $1.2B Batangas-Manila Natural Gas Pipeline

natural gas pipeline projectThe Arroyo administration is set to bid out a $1.2 billion natural gas pipeline from Batangas to Manila (Batman 1) as part of the long-term power project of the administration. This project is expected to lower the cost of natural gas in the country.

This is a joint venture between the Philippine National Oil Co. (PNOC), Abu Dhabi-based Sultan International Holdings (SIH), Abacus Consolidated Resources and Holdings, and Italy-based SAIPEM Eni. Batangas Rep. Hermilando Mandanas hoped for the bidding to happen before mid-march so they “can comply with all the legal requirements”.

Deputy Presidential Spokesman stated that Malacañang is concerned about the effects of El Niño in the country’s power supply. But he said the government is making all the necessary adjustments and that the situation is closely being monitored.

[tags]natural gas pipeline in batangas, batangas-manila pipeline, batman 1 project, arroyo administration batman1 project, el niño phenomenon, effects of el niño in power supply, power interruptions, power suply shortage[/tags]

About Publisher

JR Cantos is the Publisher of WOWBatangas.com. Some of the articles here on the website have been contributed over the years, so please just email us at help (at) wowbatangas.com if you have any concerns. Salamat!

Check Also

JCI-Lipa Hosts SOLAC 2024, Wows Delegates with Trademark Batangueno Culture and Hospitality

JCI (Junior Chamber International) -Lipa hosted over 500 delegates at the 44th JCI Philippines Southern …

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.